Scale of Rates
CHARGES FOR SERVICES RENDERED TO CONTAINERS AND CONTAINERIZED CARGO


GENERAL TERMS AND CONDITIONS:

(i). Containers less than and upto 20 feet in length will be reckoned as one TEU for the purpose of Tariff.

(ii). All charges for containers more than 20' in length and upto 40' in length will be 150 per cent of the applicable charges prescribed in clause 3.3.1.

(iii). Handling charges for container more than 40' length and upto 45' in length will be 200 per cent of the applicable charges prescribed in clause 3.3.1.

(iv). Containers other than that of standard size requiring special devices or slings for handling will be charged twice the applicable charges under clause 3.3.1. Such a containers will also include damage containers and any other types requiring special devices.

3.3.1. CHARGES FOR HANDLING AND MOVEMENT OF
CONTAINERS:


The following consolidated charges for handling and movement of container shall be payable by the Shipping Lines or Agents of vessels or cargo agents for services rendered in respect of containers and containerised cargo passing through the port

A. NORMAL CONTAINERS:

Sl. No.
Description
Rate per TEU (in Rs.)
Foreign Container Coastal Container
Loaded
Empty
Loaded
Empty
1. From Ship to Container yard or vice versa 2600.00 2100.00 1560.00 1260.00
2. From container yard to container Freight Station or vice versa 925.00 925.00 555.00 555.00
3. From Container Yard to Railway flat or vice versa (ICD Container Rail only) 1300.00 1300.00 780.00 780.00
4. From Container Yard to Truck or vice versa (direct delivery and export intake). 400.00 400.00 240.00 240.00
B.       REEFER CONTAINERS: 
Sl. No.
Description
Rate per TEU (in Rs.)
  Foreign Container Coastal Container
Loaded Empty Loaded Empty
1. From Ship to Container yard or vice versa 2600.00 2100.00 1560.00 1260.00
2. From container yard to container Freight Station or vice versa 925.00 925.00 555.00 555.00
3. From Container Yard to Railway flat or vice versa (ICD Container Rail only) 1300.00 1300.00 780.00 780.00
4.
From Container Yard to Truck or vice versa (direct delivery and export intake).
400.00
400.00
240.00
240.00
 C.   HAZARDOUS CONTAINERS:    
Sl. No. Description
Rate per TEU
(in Rs.)
Foreign Container Coastal Container
Loaded Empty Loaded Empty
1. From Ship to Container yard or vice versa 3000.00 ­- 1800.00 --
2. From container yard to container Freight Station or vice versa 1000.00 -- 600.00 --
3. From Container Yard to Railway flat or vice versa (ICD Container Rail only) 1500.00 -- 900.00 --
4.
From Container Yard to Truck or vice versa (direct delivery and export intake).
500.00
--
300.00
--
D. TRANSHIPMENT CONTAINERS: 
Sl. No. Description
Rate per TEU (in Rs.)
Foreign Container
Loaded
Empty
1. 1 - 3000 TEUs 3000.00 2600.00
2. 3001 - 6000 TEUs 2800.00 2400.00
3. 6001 - 9000 TEUs 2600.00 2200.00
4. Thereafter 2400.00 2000.00
 Notes:

(1).Rate is based on total TEUs brought by the Shipping Lines or agents in the same financial year.

(2).A container originally declared as transhipment container, subsequently moved by rail or road will lose the identity as transhipment container and shall be treated as normal import container and prescribed charges as applicable shall be payable.
E: OVER DIMENSIONAL CARGO CONTAINER:
Sl. No.
Description
Rate per TEU (in Rs.)
Foreign Container Coastal Container
Loaded Empty Loaded Empty
1. From Ship to Container yard or vice versa 5200.00 4200.00 3120.00 2520.00
2. From container yard to container Freight Station or vice versa 1850.00 1850.00 1110.00 1110.00
3. From Container Yard to Railway flat or vice versa (ICD Container Rail only) 2600.00 2600.00 1560.00 1560.00
4. From Container Yard to Truck or vice versa (direct delivery and export intake). 800.00 800.00 480.00 480.00
F.  SHUTOUT CONTAINERS: 
Sl. No. Description Rate per TEU
Foreign-going vessels
Coastal vessels
1. Shutout Charges $ 41.19 Rs. 1080.00
2. Transportation of shutout container from any place in the Port to quay and back to the designated area irrespective of location inside the terminal. Rs. 1500.00 Rs. 900.00
G.  REEFER MONITORING AND CONNECTION: 
Sl. No. Description
Rate per TEU (in Rs.)
  Foreign-going
vessels (in US$)
Coastal vessels
(in Rs.)
Loaded
Empty
Loaded
Empty
1. Additional charges per 8 hours or part thereof for electricity consumption and monitoring of reefer containers 8.24 8.24 400.00 400.00
Note:  Additional electricity charge at the prescribed rates will be applicable in case of Reefer Restow Containers also. 
H.  OTHER SERVICES RENDERED: 
Sl. No.
Description
Rate per TEU (in Rs.)
Foreign Container Coastal Container
Loaded Empty Loaded Empty
1. Shifting of containers from one yard to another yard within the terminal for customs inspection or any other purpose and subsequent loading of containers for Delivery. 1700.00 1700.00 1020.00 1020.00
2. Additional service charges for stacking containers in designated yard for custom examination or for any other purpose by prior arrangement.                        200.00 200.00 120.00 120.00
Note: The consolidated charges as above include the following elements, viz. stevedoring, use of Gantry crane, use of transfer crane, wharfage on tare weight of containers, wharfage on containerized cargo, transportation and contribution towards railway infrastructure. 

3.3.2. REBATES: 

With the prior permission of JNPT authorities, rebates as follows shall be applicable to port users for carrying out various operations with their own arrangements when the JNPT equipments are out of order or not available because they are hired to other user or for any other reason. 
 Sl. No. Description
Rate per TEU (in Rs.)
  Foreign Vessels Coastal Vessels
Loaded Empty Loaded Empty
1.
If the ship's gears are used for loading /unloading containers from ship to shore or vice versa -
Upto 20’ in length -
Over 20’ in length






600.00 800.00






600.00
800.00






360.00 480.00






360.00 480.00

2.
If the Port user employs his own
Tractor Trailer (T.T.) for transporting
containers from Quay to container
yard or Container yard to quay -
Upto 20’ in length -
Over 20’ in length
 

 





300.00 450.00
  







300.00
450.00
 

 





180.00 270.00
  







180.00 270.00
3.
If the user brings his own equipment
for lifting containers from container
yard to truck and vice versa. -
Upto 20’ in length -
Over 20’ in length






250.00 375.00
 





250.00
375.00






150.00 225.00
 





150.00 225.00

4.If the Port user provides lashing/unlashing gang for lashing operations of containers, then a rebate of Rs. 30 per foreign container and Rs. 18 per coastal container in handling charges shall be allowed. The rebate shall be limited to the number of containers actually lashed. 

5.Any vessel performing more than 1,000 TEUs in a single call, shall qualify for a rebate amounting to the following percentage of the total handling charges applicable for the vessel:                   
- More than

               - More than 1000 TEUs but upto 1200               2 percent
               - More than 1200 TEUs but upto 1500               3 percent                - More than 1500 TEUs but upto 1800               4 percent                - More than 1800 TEUs but upto 2200               5 percent                - More than 2200 TEUs but upto 2600               6 percent                - More than 2600 TEUs                                    7 percent 

6.No rebate will be admissible for back to town containers handled by private equipments. 
 
3.3.3.    DWELL TIME CHARGES FOR CONTAINER, STORED IN THE PORT PREMISES: 
Sl. No.
Particulars
Rate per container per day or part thereof (In US $)
    Upto 20’ in length Over 20’ to upto 40’ in length
1. Non-ICD Import & export - loaded 
First 3 days
4-15 days
16-30 days
Thereafter
 

Free
3.25
6.50
13.00
 

Free
6.50
13.00
26.00
2. Non ICD Import &
export - empty
First 3 days 
4-15 days
16-30 days 
Thereafter
 

Free 
3.25
6.50
13.00
 

Free
6.50
13.00
26.00
3.
ICD Import & export
- loaded - moved by
road
First 7 days
8-15 days
16-30 days
Thereafter
 


Free
3.25
6.50
13.00
 


Free
6.50
13.00
26.00
4.
ICD Import & export
- empty - moved by
road
First 3 days 
4-15 days
16-30 days 
Thereafter
 


Free
3.25
6.50
13.00
 


Free
6.50
13.00
26.00
5.     ICD Import & Export
-loaded or empty -
moved by Rail 
First 15 days
16-30 days
31-45 days
Thereafter
 


Free
2.86
5.72
11.44
 


Free
5.72
11.44
22.88
6.
Transhipment -
loaded 
First 30 days
31-45 days
Thereafter
 

Free
3.25
6.50
 

Free
6.50
13.00
7.
Transhipment -
empty 
First 15 days
16-30 days
31-45 days
Thereafter
 

Free
3.25
6.50
13.00
 

Free
3.25
13.00
26.00
8.
Shutout - loaded &
empty
1-15 days 
16-30 days
Thereafter
 


3.25
6.50
13.00
 


6.50
13.00
26.00
9.
Back to Town -
loaded & empty
First 3 days
4-15 days
16-30 days
Thereafter
 

Free
3.25
6.50
13.00
 

Free
6.50
13.00
26.00
Notes: 

(1). The total storage period for a container shall be reckoned from the day following the day of landing upto the day of shipment/delivery/date of removal of the container and includes Sundays and Holidays. 

(2). Transhipment containers subsequently changing the mode of dispatch locally or to the container freight station for destuffing/stuffing shall loose the concessional dwell time as prescribed in Item (4) above. Dwell time charges for such containers shall be recovered at par with import containers as prescribed in item No.1 or 2 as applicable. 

(3) Transhipment containers subsequently changing the mode of dispatch by rail to ICD shall be treated as other ICD containers for the purpose of levy of Dwell time charges fees and shall be charged at the rates in item (4) above. In such cases additional shifting charge will be applicable for movement of container from container yard to ICD yard. 

(4). Normal import containers subsequently changing the mode of dispatch by rail to ICD will enjoy the free period applicable to normal import container only. In such cases additional shifting charges will be applicable for movement of container from container yard to ICD yard. 

(5). The total storage period for a shutout container shall be calculated from the day following the day when the container has become shutout till the day of Shipment/delivery. 

(6). Over high and over dimensional containers shall attract thrice the normal applicable charges. 

(7). Reefer and hazardous containers shall attract 1.5 times the normal applicable charges. 

(8). In case of stuffing the containers inside the port, the dwell time charges will be applicable as follows: 

(i).Prior to stuffing, dwell time charges as applicable to empty containers will be charged. 

(ii).Free period and dwell time charges as applicable to loaded export containers will be charged from the day following the day of completion of stuffing and intimation to Port. 

(9).In the case of auction containers, after the auction is over, the empty containers will attract the dwell time charges as empty containers from the following day the destuffing is completed. 

(10).The storage charges on abandoned FCL containers/shipper owned containers shall be levied upto the date of receipt of intimation of abandonment in writing or 75 days from the day of landing of the container, whichever is earlier subject to the following condition:

(i). The consignee can issue a letter of abandonment at any time.

(ii). If the consignee chooses not to issue such letter of abandonment, the container Agent/MLO can also issue abandonment letter subject to the condition that,

(a).the Line shall resume custody of container along  with cargo and either take back it or remove it from the port premises; and

(b).the line shall pay all port charges accrued on the cargo and container before resuming custody of the container.

(iii). The container Agent /MLO shall observe the necessary formalities  and bear the cost of transportation and destuffing. In case of their failure to take such action within the stipulated period, the storage charge on container shall be continued to be levied till such time all necessary actions are taken by the shipping lines for destuffing the cargo.

(iv). Where the container is seized/confiscated by the Custom Authorities and the same cannot be destuffed within the prescribed time limit of 75 days, the storage charges will cease to apply from the day the Custom order release of the cargo subject to lines observing the necessary formalities and bearing the cost of transportation and destuffing. Otherwise, seized/confiscated containers should be removed by the line/consignee from the port premises to the Customs bonded area and in that case the storage charge shall cease to apply from the day of such removal.
3.3.4.    CHARGES FOR MISCELLANEOUS SERVICES RENDERED TO THE CONTAINER VESSELS: 
HATCH COVER CHARGES             
A. OPENING OF HATCH COVER AND REPLACING IT: 
Description
Rate per Hatch Cover
Foreign-going vessels (in US $)
Coastal vessels (in Rs.)
When placing it on the quay 61.78 1619.00
Without placing it on the quay 24.71  648.00
Note: If only one operation is carried out, half of the hatch cover handling charges as above shall be levied.
ONE HATCH TO ANOTHER HATCH OR WITHIN THE SAME HATCH:           
Description
Rate per TEU (in US $)
Foreign vessels (in US$) Coastal vessels (in Rs.)
Loaded Empty Loaded Empty
(a). Hatch to hatch shifting (involving 1 move only) 20.59 20.59 540.00 540.00
(b).  Other than (a) mentioned above
82.37
82.37
2159.00
2159.00
 
3.3.5. STORAGE CHARGES ON UNCLEARED GOODS: 
Dwell time charges to be levied in respect of cargo which are sold in accordance with Sections 61 and 62 of Major Port Trusts Act, 1963 - 
Description Rate per metric tonne per day (in Rs.)
Storage of cargo in covered space destuffed from the long standing containers in case the original consignee comes forward to take delivery of cargo  30.00
Warehouse rental charges from 6th day till 20th day (both days inclusive) after the date of confirmation of sale of the uncleared cargo. First 5 working days are free.  90.00
Warehouse rental charges from 21st day onwards after the date of confirmation of sale of the uncleared cargo.  120.00
3.3.6. PROCEDURE AND CHARGES FOR INTER TERMINAL TRANSFER OF TRANSHIPMENT OF CONTAINERS BETWEEN THE JNPT AND THE NSICT

A. Procedure for handling transhipment (TP) containers: 


(i). TP Containers discharged at the JNPT and bound to be loaded at the NSICT will be transported by the JNP TTs; and, the JNP RTGCs will discharge thses containers in the NSICT yard of 4G. 

(ii).Similarly, TP Containers discharged at the NSICT and bound to be loaded at the JNPT will be discharged by the NSICT by using its RTGCs and TTs in CY31 of the JNPT.

B.Charges for handling TP containers: 

(i).If a container is discharged by the JNPT and loaded by the NSICT at its terminal, the charges will be as under: -

50% of transhipment container handling charges as per the JNPT Scale of Rates will be charges to the Line by the JNPT.

For the same container the NSICT will charge 50% of the transhipment container handling charges as per its Scale of Rates; and, in addition, also levy a charge of Rs. 1428/- (for 20’) and Rs. 2142/- (for 40’) towards inter-terminal transfer. 

(ii).If a container is discharged by the NSICT and loaded by the JNPT at its terminal, the charges will be as under:- 

The NSICT will charge 50% of transhipment container handling charges to the Line as per its Scale of Rates.

For the same container the JNPT will charge 50% of TP handling charges as per its Scale of Rates; and, in addition, also levy a charge of Rs. 1300/- (for 20’) and Rs. 1950/- (for 40’) towards inter-terminal transfer.
 
right
 
Container Number
 
    Press Releases
    Trade Notices
    Right To Info. Act-2005
   Circulars
List of parties ,have submitted EOI for 4th TERMINAL
Untitled Document
    Sitemap | Terms & Conditions | Customer Complaint  | Home
    Copyright © 2004 Jawaharlal Nehru Port Trust. All Rights Reserved.
    Disclaimer: - Information content in this site is correct to the best of our knowledge
Designed & Developed by